Supply chain control system

Quality management policy

Establish supplier selection and evaluation standards, have an in-depth understanding of cooperative enterprises, give full play to advantages and avoid risks. Sign a quality assurance agreement, stipulate the component yield standard, if the component does not meet the standard, it can be rejected and the right to pursue investigations can be initiated. By signing an environmental protection agreement, IDO attaches great importance to and supports environmental protection undertakings and assists customers in responding to strict environmental regulations and requirements in Europe and America. Advocating long-term cooperation and win-win relationship, the cooperation with some suppliers has been maintained from the beginning of the establishment of the company to the present.

Quality management organization structure

Establish the whole process quality management organization of four representative organizations: [1] Software and hardware quality acceptance control represented by testing [2] Whole-process product quality control planning represented by R&D quality [3] Delivery quality improvement represented by the Quality Assurance Department [4] Improving the company’s system capabilities and customer satisfaction represented by the Quality Management Department

Whole process quality assurance

Reliability Laboratory

ITFool-proofing

Project phase I

Start-up preparation phase

Internal research

Understand the business needs of the manufacturing department, and output the business needs confirmation. Plan a demonstration production line, arrange and gradually roll out the timetable for a comprehensive application plan

System selection
The business department determines the MES system selection, confirms the modules and main functions, and the IT information department is responsible for technical confirmation

Project phase II

Start-up implementation phase

Network hypothesis

The factory line body carries out industrial network construction, and wired and wireless information points provide hardware support for information collection.

Core system
The main system and test module system environment and database environment have been set up, and the internal test before going live has been completed.

System training
Complete pre-launch training

Project phase III

On-line application stage

Officially launched

The demonstration line officially started MES system management and applied systematic management processes.

Equipment integration
Data collection and interface development of intelligent equipment are carried out at the same time.

Kanban and report
After the quantitative data is collected, the hypothesis of the kanban and the custom development of the report form are carried out.

Project phase IV

System integration and mature extended application

System integration

After the MES operation is mature and stable, cross-system interface integration development work will be carried out to realize data interaction between systems.

Extended application
Secondary development of extended functions.

System operation
Ensure the effective operation of the system.

After-sales service

Establish the whole process quality management organization of four representative organizations: [1] Software and hardware quality acceptance control represented by testing [2] Whole-process product quality control planning represented by R&D quality [3] Delivery quality improvement represented by the Quality Assurance Department [4] Improving the company’s system capabilities and customer satisfaction represented by the Quality Management Department